FIELDS OF USAGE
ATMOSPHERIC METAL STRUCTURES
WATER SUPPLY
EMBEDDED FITTINGS
TRANSPORT SUPPLY
PETROLEUM TANKS
PETROLEUM PRODUCTS TANKS
STEEL SHEET
PIPES
PORT INSTALLATION

Reservoirs for storing clear petroleum products, pure and extra pure substances

These recommendations cover anticorrosion protection of above-ground and underground vertical welded carbon steel reservoirs designed for storing petroleum products, pure and extra pure hydrocarbon fluids used as fuels Requirements to the coating.

Corrosion- and petrol-resistance, fire-resistance; maintained continuity during usage - these requirements are met by the coating obtained by cold zincing by ZFES, produced by ZAO NPP VMP. ZFES composition is a two-package material prepared by mixing the binder with zinc powder. According to Specs, the mass ratio "binder (component A) to powder (component B)" in ZFES No. 1 is 1:1. The coating was tested by Russian branch Institutes; according to the branch standards the coating is certified and may be used for protecting internal surfaces of fuel storage reservoirs. The coating has Lloyd's Register certificate No. MATS/1515/1.

Properties of the ZVES coating. ZFES coating contains 89-90 mass % of metal zinc. It is a conducting material; specific electric resistance, depending on the ZFES composition, is 101-102 Ohm/m. Initial potential to the chloride-silver electrode, depending on the content of zinc in the dry coating, is 0.85 - 0.95 V. It is anodic towards steel and provides cathode protection. The coating does not accumulate static electricity and is non-sparking on impact. The coating's tension strength is identical to that of the metal being protected, which ensures its maintained continuity throughout the reservoir's stretching and compression along with temperature drop during use. The coating is incombustible and belongs to the group of materials that do not spread flame on the surface. It does not affect clear petrol products contacting with it.

Recommended protection systems

Reservoir's internal surface: 4-5 layers of ZFES No. 1 with the total coating thickness of 120-150 µm. Roofs and pontoons may be coated with 4 layers of ZFES No. 1 with the total thickness of 100-120 µm.
Reservoir's external surface: Along the whole height and roof - 3 layers of ZFES # 1 + 1-2 layers of PAES composition (or ALUMOTAN composition). The total coating thickness should be at least 120 µm. The coating colour is silver. Compositions PAES (Specs 2312-013-12288779-99) and ALUMOTAN supplied by ZAO NPP VMP complete with the composition ZVES. For the external surface protection, compositions PAES and ALUMOTAN may be replaced by enamels XB-16, XB-124, XB-124, XB-785, Vinicolor, Vinicor-62, that should be applied in 2-3 layers. The net consumption of ZFES No. 1 is 0.16 kg/m2 per one layer (20-30 µm ), of PAES - 0.10 kg/m2 per one layer (10-20 µm ) and of ALUMOTAN - 0.12 kg/m2 per one coat (20-30 µm).

Application methods

1. Preparation of the paint.

Paint ZFES is a two-package material. The composition consists of ethyl-silicate binder (component A) and zinc powder (component B). 2 composition brands are manufactured - ZFES # 1 and ZFES # 2, which differ by mass ratio of components A and B (1: 1 and 1: 1,5 correspondingly). Composition is prepared immediately before using by mixing of components. Longevity of the paint at temperature 200C isn't less than 8 hours. The paint is considered viable if there is no film on its surface and no jelly-like lumps in it. Composition is prepared as follows: Zinc powder is poured gradually into the pail with the binder (not the other way!) at constant stirring. When all the powder is poured, the mixture is stirred during 2-3 minutes and left till intensive gassing stops (approximately 20-30 min.). Conditional viscosity of the ready paint by viscosimeter V3-246 with nozzle diameter 4 mm at 200C is 18 - 35 sec.

2. Surface preparation.

  • Remove all surface defects (sharp edges, wire-edges, welding drops, etc.);
  • Degrease the surface up to grade 1 as per State Standard 9.402-80;
  • Remove rust and oxides up to grade 2 as per State Standard 9.402-80 or Sa 2.5 according to ISO 8501-1:1988 by blast-cleaning. After mechanical cleaning the dust should be removed from the surface. Presence of moisture on the surface is not permissible. Time lag between the surface preparation and paint first layer application shouldn't exceed 24 hours indoors or 6 hours outdoors.

    3. Composition application.

    When applying the paint it is necessary to take into account that ZFES doesn't require additional use of solvent; it refers to the class of quickly curing paint-&-varnish materials and requires permanent stirring in order to prevent precipitation of zinc powder. Conditions of the paint application:

  • ambient temperature from - 150C to +400C;
  • relative humidity - 30%-80%, optimal value - not less than 50%. If the painting occurs at temperature below zero, the components should be kept in the warm for 24 hours, then mix the components and use by small portions.
  • in order to prevent moisture condensation on the surface being painted it is necessary to maintain metal surface temperature 30C higher than the dew point temperature ZFES is applied by pneumatic and airless spraying, by brush or by roller.

    Technological conditions of application: Airless spraying:

  • spraying pressure: 10-20 MPa;
  • nozzle diameter: 0,33 - 0,53 mm (0,013 - 0,021 inches); Pneumatic spraying:
  • compressed air pressure: 0,3 - 0,4 MPa;
  • nozzle diameter: 1,8 - 2,2 mm; Sharp edges, corners, welding seams and other spots difficult to access should be painted with brush. When the paint application is conducted by brush or by roller, it is not recommended to pass one and the same spot repeatedly. ZFES is naturally cured. One layer of the coating is cured up to "pull of" grade (slight touch by the finger doesn't leave traces and isn't clammy) at the ambient temperature at (20±2)0C and humidity (65±5) % within 30 minutes. But in closed cavities and places difficult to access curing time can increase approximately by 1,2. Before the coating contacts with aggressive medium it should be kept intact not less than 7 days, maximum time of the exposure is not limited. ZFES is repairable. Defect spots of the coating should be removed, the surface should be cleaned till it shines, degreased and re-painted. As a finishing composition PAES based on aluminium powder, urethane- and acrylic-based enamels POLYTON, vinyl-epoxy, perchlorovinyl, copolymer-vinyl-chloride, epoxy, epoxy-ether, urethane and melamine enamels. The finishing layers application should be conducted not earlier than 24 hours after application of the last layer of ZFES. Composition PAES is applied after 2 hours. Before the coating contacts with liquid medium it should be kept intact not less than 7 days. In order to ensure high quality of the work regular cleaning of the equipment and fulfilling all rules of maintenance are necessary.
  • it is recommended to pass solvent through the paint sprayer for a few minutes before starting the work;
  • after finishing work with the paint ZFES gear and equipment for preparation and application of the composition should be washed with solvent; Solvents for washing the equipment are: types P-6, P-7, P-60, marks 646, 648, white spirit, xylol, toluene, solvent and their mixtures. Net consumption of the paint ZVES according to its composition: ZFES #1 - 130-200 g/m3 for one layer of dry coating with dry film thickness of 20 - 30 µm; ZFES #2 - 170-230 g/m3 for one layer of dry coating with dry film thickness of 30 - 40 µm

    4. Coating Quality Control

    After complete curing of the coating it is accepted according to the following requirements: appearance, thickness, adhesion. The coating should be firm enough to bear the pressing of the gear for coating thickness estimation. Appearance is estimated visually. Coating thickness is estimated by magnet thickness gauges. Adhesion is estimated by latticed cut test (State Standard 15140-78). The coating spots damaged during the tests are renewed up to the necessary total thickness.

    Quality criteria Inspection method Quality properties
    Appearance Visual Coating surface – low-gloss, gray, without impurities
    Thickness By portable thickness gauges According to the selected protection scheme
    Adhesion By the lattice notch method 1 point


    The coating may be used not earlier than 7 days after the painting. The technology of applying the ZFES compound is detailed in the Application Guideline.